Hybrid-VPP4DSO
February 10, 2015
  • Design, evaluation, and validation of a hybrid virtual power plant
  • Integration of renewables
  • Implemented in Slovenia and Austria

The aim of the project hybrid-VPP4DSO was the design, evaluation, and validation of a hybrid virtual power plant concept, including electricity generation from renewable resources as well as consumer-related measures (provision of megawatts) to optimize the power system. Network and market driven approaches were combined, especially to provide services for the requirements of distribution grid operators.

A hybrid virtual power plant

The simulation-based development of the hybrid-VPP-concept was performed with real company data. After successful validation, a proof of concept in two specific network areas in Slovenia and Austria was put in place. Furthermore, the possibilities for business models, technical and not-technical barriers of the VPP market were evaluated.

- Coordinator: AIT
- Project partners: CyberGrid, TU Vienna, Energetic Solutions, Grazer Energieagentur, Elektro Ljubljana, Stromnetz Steiermark, Energie Steiermark, Elektro Energija
- R&D programme: KLIEN/FFG e!MISSION.at
- Time frame: 2014–2016

Official project website  

Click here to read the final report (German version)

Check event page

Other R&D Projects:

eBADGE project logo
R&D Projects
October 2, 2024

eBADGE

Intelligent balancing mechanism to integrate virtual power plant systems

EvolvDSO project logo
R&D Projects
October 2, 2024

evolvDSO

Development of methodologies and tools for new and evolving DSO roles for efficient DRES integration in distribution networks

Flexiciency EU-funded project
R&D Projects
October 2, 2024

Flexiciency

Addressing flexibility and efficiency within the European energy market